Leveraging MLCP for Seamless Hotel Renovation

Heritage Gas was tasked with a complex plumbing and heating renovation project at a 78-bed hotel on the Folkestone seafront. The project presented a unique challenge: the hotel needed to remain operational throughout the entire renovation process. This meant the existing plumbing system had to be maintained while the new system was installed.

Heritage Gas recognised the flexibility and efficiency of Multipipe’s MLCP system as the ideal solution for this project. The phased approach, involving floor-by-floor installation, ensured minimal disruption to the hotel’s operations.

Project at a glance:

  • 78-Bed Hotel on Folkstone Sea Front
  • Hotel remained open during renovation
  • 1,500m + MLCP installed
  • ~1000 press-fit fittings
  • 16-75mm MLC pipework

“Multipipe’s MLCP system was a game-changer for the Folkestone hotel project. The flexibility of the pipe allowed us to work around existing structures, minimising disruption to the hotel’s operations. The ease of installation and the reliability of the system ensured a smooth and efficient project delivery.” – Mike, Heritage Gas

Read the full case study here.